Location: Pamplona

Capacity: 11.850 spectators

Built surface: 45.685 m2

Achitect: TYM Asociados

Developer: Government of Navarre (ISYN)

Installation manager: NICDO

Start of works: 2009

End of works: 2018.

Budget: 60 milion euro.

The pavilion Navarre Arena is a multi-use building. It can take culture and sport events, as well as international and national festive and corporative activities.

Thanks to its design, it can easily adapt to different number of spectators.In addition, the infrastructure of the building is very appropiate to shooting films and advertisements.

It has telescopic stands, which can be quickly adapted to the needs of the client.

Versatility and usefulness have been the most important elements of its design.The building has been built following current legislation on energy efficiency (geothermal science/biomass/ heat pumps/ newest type of air conditioning).

1.

MAIN AREA

Surface: 3.000 m2

Capacity (sitting) 9.850 espectadores

The overall capacity of the stands is about 10.000 people, but this can also be adapted to host smaller audiences, using systems of subdivision.

2.

ASSISTING AREA

Surface 1.600 m2

Capacity (sitting) 1.500 spectators

Multi-use space for sport and festive activities. It can also work as assiting space for events carried out in the main area.

3.

PELOTA COURT AREA

Surface 600 m2

Capacity (sitting) 3.000 espectators

The facility will have a large pelota court (frontón).

4.

OFFICE AREA

The building will include the headquartes of the Sport Federations in Navarre and the Institute of Sport and Youth in Navarre (ISYN).

5.

ASSISTANT SPACES

Multi-use room. 250 people.
Audiovisual room.50 people.
Panoramic walkway. 250 people.
Press room. 100 people.
Meeting rooms
Gym/Backstage (300 m2)

6.

SERVICE SPACE

Coffee Shop
Changing rooms
Dressing rooms
Warehouse 6.000 m3
Public parking space (300 places)

7.

LOADING SPACE

The building allows to bring trailers to the main space in order to minimise the time to set the event up, and to make the process more simple.